Continuous Chaos CI/CD Verification Gates
Chaos & SRE Sprint β Day 7 Capstone
Embed Chaos Mesh Workflows and automated MTTR / Error-Budget resiliency gates into GitHub Actions CI/CD pipelines to block fragile releases before production.
In this Day 7 Capstone playbook, you will wire a serial Chaos Mesh Workflow and an automated CI/CD Resiliency Gate (chaos-ci-gate.js) into GitHub Actions so that any pull request that degrades recovery time (MTTR > 3000ms) or burns more than 2% of the error budget is automatically blocked from deployment.
The official reference codebase for Day 7 is hosted in the repository. Clone the repository and navigate to day-7-cicd-chaos-gates to run the working solution.
git clone https://github.com/letstrnsfrm-ai/chaos-engineering-roadmap.git
cd chaos-engineering-roadmap/day-7-cicd-chaos-gatesInspect Serial Chaos Mesh Workflow & CI Gate
Review the declarative Chaos Mesh Workflow CRD that chains network delay, pod eviction, and SLO recovery checks.
apiVersion: chaos-mesh.org/v1alpha1
kind: Workflow
metadata:
name: continuous-checkout-resiliency-workflow
namespace: checkout-mesh
spec:
entry: resiliency-serial-pipeline
templates:
- name: resiliency-serial-pipeline
templateType: Serial
deadline: 5m
children:
- inject-network-latency
- inject-pod-eviction
- verify-slo-recoveryExecute Master 7-Day Chaos Suite & CI Gate
Run the Day 7 CI resiliency gate and the complete 7-day master verification suite (`npm test`).
npm run test:day7
npm testTrack Completed: Chaos & Site Reliability Quality Architect
You have mastered Steady-State Hypothesis design, NetworkChaos latency & split-brain partitions, PodChaos zero-downtime evictions, IOChaos database deadlock circuit breakers, Multi-Agent Chaos Orchestration with SLI abort gates, automated blast-radius post-mortems, and Continuous Chaos CI/CD gating!
β Return to All Roadmaps- Chained multi-stage fault injection using a Chaos Mesh Serial Workflow CRD.
- Enforced hard CI/CD release gates on MTTR <= 3000ms and Error Budget Burn <= 2%.
- Verified 100% pass rate across all 7 days of the AI Chaos Engineering & Autonomous Resiliency suite.
π§ Knowledge Check
Why should teams transition from manual quarterly Game Days to Continuous Chaos gates in CI/CD?